The brick is done on the outside, (except caps for the pillars on the front porch), the interior doors are done down stairs the tile guy has the down stairs bathroom done, it is all taped textured painted except for specialty painting that Marijo is doing. The wood floors are all in. The electrician, plumber, heating and cabinet guys are all coming this week. It is getting there. We hope to move in by the 28th of October.
0 Comments:
Post a Comment
<< Home